Duplex in East Point
Atlanta 2025
This duplex underwent a full interior and exterior renovation designed to modernize the property, correct deferred maintenance, and position the asset for long-term durability and stable rental performance.
The scope of work included a complete gut of the interior walls and floors, allowing for updated finishes and improved overall quality throughout both units. Bathrooms were fully renovated with new fixtures and finishes, creating clean, functional, and modern spaces.
Each unit was equipped with brand-new appliances, including in-unit washer and dryer, supporting resident convenience and long-term tenant retention. New flooring was installed throughout, paired with new windows to improve comfort, efficiency, and natural light.
The property was repainted inside and out, delivering a cohesive, updated appearance and reinforcing the long-term repositioning of the asset.
This renovation reflects Mimi Enterprises’ commitment to responsible redevelopment—prioritizing durability, livability, and long-term ownership over cosmetic improvements alone.